When we arrived at school this morning, the concrete trucks had arrived and had started the first pour. A crane was used to get the concrete from the truck, over the fence and onto the building site.
The slab is down for the new classroom and the covered outdoor learning area (COLA). There will be a second pour when the formwork for the new library is complete.
No comments:
Post a Comment