Wednesday, June 23, 2010

The bricks were delivered today.


The pallets of bricks were delivered this morning. It would be interesting to work out how many there are - there's a challenge for you!
The brick walls will start to be built tomorrow. There should be quite a change by the time we get back next week.

Steel structure takes form.


Within a couple of days, the steel structure for both new rooms was erected. The shape is becoming apparent. Soon, the roof and walls will be added.

The frameworkk is delivered.

The big crane was used to deliver the structural steel that would be fit together to form the frame for the two new buildings. It it so clever how the steel is carefullly installed.

Tuesday, June 1, 2010

Foundation for library progressing


The waffle pods have been laid for the library foundation. The concrete will be poured very soon.

Wednesday, May 26, 2010

First Pour of Concrete











When we arrived at school this morning, the concrete trucks had arrived and had started the first pour. A crane was used to get the concrete from the truck, over the fence and onto the building site.


The slab is down for the new classroom and the covered outdoor learning area (COLA). There will be a second pour when the formwork for the new library is complete.





Thursday, May 20, 2010

The formwork begins.



The formwork for the concrete slab is being laid at the moment. Big blocks of polystyrofoam, called waffle pods are laid first, with steel mesh placed over the top.

When all that is done, the concrete will be poured. We can't wait to see all the concrete mixers when they arrive!

Sunday, May 16, 2010

Slowly but surely!


There is a lot of work going on that we can't see. Lots of things are buried underground.
Isn't it amazing how these pipes will be in exactly the right place? Builders, engineers and architects are very clever people.